Skip links

ARRABONA industrial area

Project Brief

The 100 hectares Arrabona Industrial Park (AIP) development area is located next to the Győr / Arrabona rest area of the M1 (E60) highway in the close vicinity of Audi car factory and the city. The Arrabona Industrial Park is perfectly suiting automotive supply chain and regional logistics demand.

The proposed project opportunity involves the surrounding development lands into a bigger scale development concept by managing a regionally unique, 100-hectare development area. By the effective zoning plan of Győrújbarát, the areas classified to economic and commercial, service zone.

Gyorujbarat

Győrújbarát connecting road
ROAD Nr. 81311

Development area

1 Million
square metres

New Roundabout

Two way access road
Main entrance

Access form M1 Highway

Directional traffic from
M1 (E60) Highway

Direct Highway Access

Road Nr 82
Győr city center 8 minutes drive

10 minutes

Nearest City Centre

Győr - 9 km
Vienna - 125 km
Budapest - 120 km
Bratislava - 80 km

10 Minutes

Nearest Airport

Győr-Pér - 12 km
Bratislava (BTS) - 90 km
Vienna (VIE) - 110 km
Budapest (BUD) - 151 km

20 Minutes

Nearest River Port

Győr-Gönyű - 21 km
Bratislava - 85km
Vienna - 120 km

2 Minutes

Highway Access

M1 Highway (E60)
in 500 meters

3 Minutes

Train Station

Train Station
Győr - 9 km

TOTAL DEVELOPMENT AREA
1 Million+
square meters

Project Data Sheet

In accordance with the purposes of use and the interests of constantly developing technological needs, the considered requirement is maximum 15.0 meter structure height flexible plot shaping and allocation according to development needs. The implementation of a related internal traffic routes are part of the concept. The planned industrial and logistics facilities include office and social functions, as well as the provisional tract depth of at least 40 meters and one or two sided docking stations.

Total Development Area

1 033 567 sq.m.

Total Buildable Footprint

475 000 sq.m.

Concept Plan Buildable

375 000 sq.m.

Expansion Opportunity

200 000+ sq.m.

Building Height Current

6,5-12,5 meters

Building Height Modified

15 meters (in progress)

Buildable Rate

50 %

Green Area Minimum

25 %

Electricity

In progress

Water

Available on plot

Sewage

In progress

IT Infrastructure

In progress

Traffic communication

Developments in progress

The development land has perfect access to the international transport infrastructure being located directly adjacent to the Highway M1 (E60 - main European Traffic Corridor) connecting Vienna with Budapest and providing highway connection to Bratislava too. The development perfectly suits the automotive supply chain and regional logistics demand. Ideal geographic location for logistics and industrial developments near Győr.

The project lands are regulated by the structural plan and local building code of Győrújbarát. The current GKSZ function (BCS - business, commercial and services) covers the entire development area. According to the structural plan and regulation plan of Győrújbarát and the actual allowed building height is 7.5-12.5 metres. In the ongoing regulation plan change process the allowed building height will be extended to 12,5 - 15.0 metres in the vast majority of the affected areas. This result the free internal height of 10-13 m with the generally used construction technologies.

  • Flexible plot sizes
  • Utilities Available
  • Valid Organisation Plan
  • Industrial and Service Functions
  • Strategic Location
  • Within 1 km to M1 Motorway
  • 5 kilometre to Győr center
  • Distribution Centes and Logistics
  • Industrial Facilities
  • Full Service Project Management
  • Renewable Energy Concept
  • Sustainable Developments
475K
sq.m. buildable
1M
sq.m. land
500
meters to highway
10
minutes to győr

The concept

Prepare and accelerate the utilisation of the area, the development activity carry out preparatory activities which - in accordance with the needs of potential buyers - have a higher value in terms of real estate developments and can significantly shorten the implementation time of the planned projects (utility connections, transport connections, zoning plan modifications, approvals by the authorities, etc.).

Coherent development area

The adjacent lands with similar favourable characteristics are formed into coherent development area which will significantly improve the sales and utilisation potential of the location. The hundred hectares coherent development area with the cooperative involvement of the owners of adjacent parcels,created an ideal investment target for larger integrator companies as well as for the development of an industrial park.

Line of opportunities

The developer's primer objective is long term land utilisation by built-to-suit, or built-to-own projects, but industrial lands sale can be also a considerable outcome.

This website uses cookies to improve your web experience.