Production and warehouse for in a strategic distribution-logistics location, with long term lease contract to an established tenant. The tenant manufactures various interior components for the automotive industry. In line with its functional requirements, the building hosts both a large production and logistics area and an integrated administrative and social section in a two-story head building.
The built-to-suit project was constructed in line with tenant special requirements, but the facility remained very flexible for various manufacturing and logistics activities.
Total built Area
Helvecia BTS
Project Details.
The building, built in 2019/ 2020 hosts both a large production and logistics area and an integrated administrative and social section in a two-story head building.
Total Built Area
9 754 sq. m.
Total Land Area
20 317 sq. m.
Architectural Zoning
GKSZ
Buildable rate
50%
Building height
10,5 meters
Free height (hall)
8,5 meters
Hall area
8 460 sq. m.
Office and Social area
1 114 sq. m.
Rant indexation
HICP
Lease term
10 years +option
Sprinkler system
FM Global Standard
Facility maintenance
Contracted by Landlord
HALL
AREA
OFFICE
/SOCIAL
DOCKS
with
levellers
- 25 tons bridge crane (prep)
- Reinforced industrial floor
- FM Global sprinkler
- Wide bandwidth IT Network
- Open space hall
- Mid voltage power supply
- Collision protection
- LED Lightning
- Documented maintenance
Technical details
Besides being based on traditional frames, the building exhibits state of the art engineering, and electrical systems, with lightning, noise and vibration protection based on detailed risk analyses. On the NE side of the building three, on the SW side six docks with levelers have been installed.
The facade structure consists of Kingspan steel-clad sandwich panels, filled with PIR foam and rock wool. The building’s floor is prefabricated, insulated reinforced concrete footboard. The frame structure is made of reinforced concrete columns, with reinforced concrete supports on top of a reinforced base. Under columns, prefabricated foundation necks sit on monolithic concrete block bases. Additionally, the building offers sprinkler systems according to FM Global standards.
The Solution
It’s time to bring it all together. Nothing is more rewarding for me than making great work for clients with meaningful missions. Through a deep understanding of our audience’s makeup and motivations, we design digital experiences that connect with people.
We build and activate brands through cultural insight, strategic vision, and the power of emotion across every element of its expression